- Setting up and closing the site
- Included. Enclosing the working area, protecting what stays, progressive clearing, and handing the rooms back empty. Scaffolding, where it is needed, is a separate priced line, because it depends on height and on how long it stands.
- Labour, plant and the materials in the bill
- Included. Our crews, tools, lifting equipment and the materials listed in the computo metrico, with the product category stated. If a material becomes unavailable we propose an equivalent in writing, before it is fixed in place.
- Our own safety documentation
- Included. We produce our Piano Operativo di Sicurezza — the contractor's own site safety plan — and hand it over before work starts. The overall safety plan and the execution-phase safety coordinator, where the law requires them, are appointments made by you.
- Construction and demolition waste
- Included. Segregation on site, loading, and disposal at licensed facilities through registered hauliers. You receive copies of the waste identification forms, so the chain stays on record after the site closes.
- Coordinating the subcontracted trades
- Included. We programme when each firm comes in, check that they are in order before they start, and remain your single contractual counterparty for everything we have subcontracted.
- Completion pack
- Included. At the end you receive what the work produced: certificates of conformity issued by the installers, technical data sheets and declarations of performance for materials, waste paperwork, and photographs of everything that ended up behind render or under screed.
- Design and permit filings
- Excluded. CILA, SCIA, building permits, land registry updates, technical reports and structural lodgements are your technician's appointment. We do not file them and they do not appear in our quote.
- Direzione dei lavori and safety coordination
- Excluded. Site supervision exists to protect you against the contractor, so by definition the contractor cannot provide it. The appointment is yours, signed with the technician you choose.
- Utility connections
- Excluded unless agreed in writing. Meters and connections for electricity, water, gas and drainage are applications made to the utility companies, on their timescales and at their charges. We carry out the excavation, ducting and builder's work up to the connection point.
- Furniture and client-supplied goods
- Excluded. Kitchens, furniture, appliances, sanitaryware and taps, blinds and soft furnishings are not included. If you want us to install them, it goes in the quote as a line and needs a firm delivery date, otherwise the site stops and waits.
- Listed and protected buildings
- Excluded until the authorisation exists. On a protected building the methods, the materials and even the colours are prescribed by the heritage authorisation. The quote is written after reading it, not before.
- Asbestos and hazardous material
- Excluded from an ordinary quote. Removing asbestos-cement roofing or flues requires a registered specialist and a work plan filed with the local health authority. If we find it once work has started, we stop and tell you in writing.